Login
You're viewing the techdon.dev public feed.
  • Jul 21, 2026, 5:10 PM

    i’ve said it before and i’ll say it again; you’re not a network engineer unless you’ve moved a ceiling tile to trace a cable and had a small netgear switch fall on your head

    💬 1🔄 71⭐ 119

Replies

  • 💬 1🔄 0⭐ 0
  • Jul 21, 2026, 9:48 PM

    @Extelec @SecureOwl

    New shop unit built as a bare shell with the telecoms incoming cable terminated on a distribution block on an internal wall.

    Shopfitters move in and fit out the unit as a bookies, full height grey faced MDF panels on all internal walls.

    We turn up to provide service, DP is behind a panel. We ask for an access hatch to be provided.

    Shopfitters return, drill 4 holes around where the DP is, take a jigsaw and...

    ...you can guess the rest. You can probably guess the size of the bill too :-)

    💬 1🔄 0⭐ 0
  • Jul 21, 2026, 9:52 PM

    @snaprails @SecureOwl if we ate including phones, a complete 2x4 phone system screwed on to a pillar. The entire pillar was bricked round with a fancy brick wall.

    You could hear the exchange, and see the cables going to it, but no maintenance possible without removing the new wall :)

    💬 1🔄 0⭐ 0
  • Jul 21, 2026, 10:00 PM

    @Extelec Excellent. I've come across stud walls added so close to equipment racks that you couldn't get the slide-in-units out to change them but not actually bricked in. There's an office block in Reading with an outside door to the cable intake room where Armco was put in the protect the aluminium sidings of the ground floor in the car park. Only small, thin engineers can access the room because now the door only opens at best 300mm 🙄
    @SecureOwl

    💬 0🔄 0⭐ 0