> structured private reporting
Would that be reporting of a flaw to some project or from some project to the greater world? I assume both would be desired, but for the sake of an mvp, which is a requirement?
CVE numbering makes sense. There are a bunch of rules around CVE assignment that would realistically need an admin body to manage, but that's not difficult.